CHOOSE LANGUAGE
  • English
  • ဗမာစာ
  • Environmental

    What We Do

    Environmental

    Environmental Management Plan (EMP)

    Baseline Environmental Surveying necessary for all kinds of projects, especially in mining and construction. EMP is the minimum requirement to mitigate negative influences and to enhance positive influence to the surrounding ecosystem.

    Initial Environmental Examination (lEE)

    Brief examination of both constructive and obstructive effects according to implementation of mineral extraction and various infrastructure projects. lEE also includes alternative selection, mitigation measures and CSR in planning, operation and decommissioning phases of the projects.

    Environmental & Social Impact Assessment  (ESIA)

    Detailed report for environmental and social impacts suffered during all phases of the large infrastructure projects. ESIA is necessary to submit to Myanmar Investment Commission and Environmental Conservation Department (ECD) to ensure that there will be no immediate or long-time side effects casued by any business in Myanmar.

    Our Instruments for Baseline Study, Environmental Audit and Environmental Quality Moniitoring

    • OCEANUS AQM-09 Air Quality Monitor System
    • Digital Sound Level Meter
    • Vibration Meter
    • GARMIN GPS
    • BRUNTON COMPASS
    • pH TESTER
    • DIGITAL CAMERA
    • DRONE
    • 4 inch AQUARIUM NET
    • 50M MEASURING TAPE

    Types of Economic Activity

    1. Special Investment Projects
    2. Energy Sector Development
    3. Agriculture, Livestock and Forestry Development
    4. Waste Management
    5. Water Supply
    6. Manufacturing
    • Food and Beverage Manufacturing
    • Garments, Textiles and Leather Products
    • Wood Manufacturing
    • Chemicals Manufacturing
    • Manufacture of Glass and Ceramics
    • Manufacture of Construction Materials
    • Metal, Machinery and Electronics

    7.Infrastructure and Service Development

    8. Transportation

    9. Mining

    10. Construction

    11. Network